With temperatures and humidity expected to hit record highs today, it appeared that workers paving the parking lot were trying to get the job done while the sun was down last night.
At about 9 p.m., the crew was rolling out hot tar by TD Bank and had already coned off a section of freshly tarred parking lot at the rear of the store.
It's almost all done. It looks like only the section of the parking lot directly in front of the store's rear entrance is left to pave.
Patch got a few photos of the work last night. Take a look above.